Three divers (in white) are seated ready to cover the placing of a load of Portland Cement foundation which has been collected from the train on the breakwater.
This crane unloaded the barge that carried the blocks from the south breakwater. It stacked blocks and loaded them onto the train for placement.
Here the locomotive "Edward VII" waits with the inspection salon coach used by the management.
The small Hunslet "Jazzer" locomotive called "Duke of York" ascends to the quarry past the signal on leaving the prison yard. Only three vans are in use and no guards van. Probably early practice. The worker travels in one of the quarry trucks which had removable rock bins.
February 2012 and the Prison Van arrives at Maud for the first time for storage.